Reliability
We work only with trusted brands: Schroff, Rittal, Wago, Men Mikro Elektronik, Phoenix Contact, Weidmüller, Fischer Elektronik, Siemens, ABB, Schneider Electric
Quality
Our company provides a wide range of components from leading European manufacturers. We are ready to submit partner certificates, certificates of originality, inspection, testing and other
Service
We fulfill obligations on time, despite sanctions and related restrictions. Our partnership with world companies allows us to deliver almost any equipment with all necessary documents
Brands we work with
Project development
Project development is a key stage of any business case. It is an integral part of the business process as all the details and steps can be taken into account. BTS-A has certain advantages in project development: a solid experience in projects of different complexity, cooperation with trusted partners, implementation of an integrated approach to meet customer’s requirements.
Automation
Automation allows to increase productivity, to improve product quality and to optimize business solutions. Automation requires a multifaceted approach to the project development. BTS-A employees have solid experience in automation of varying complexity. We provide automation services both for enterprises (complex business automation) and for the selected technological processes (development of APCS).
Supply of equipment
Modern manufacturing is virtually impossible without high-quality reliable equipment. We offer our clients top-quality modern equipment from the leading international manufacturers. BTS-A procures equipment for every possible industry, including Oil & Gas, Mechanical Engineering, Metallurgy, Information Technologies, Energy.
Our projects
Reconstruction of the Baku-Tbilisi-Ceyhan (BTC) pipeline in partnership with Sokar
The Baku–Tbilisi–Ceyhan (BTC) pipeline is a 1,768 kilometres (1,099 mi) long crude oil pipeline from the Azeri–Chirag–Gunashli oil field in the Caspian Sea to the Mediterranean Sea. It connects Baku, the capital of Azerbaijan and Ceyhan, a port on the south-eastern Mediterranean coast of Turkey, via Tbilisi, the capital of Georgia. It is the second-longest oil pipeline in the former Soviet Union, after the Druzhba pipeline. The first oil that was pumped from the Baku end of the pipeline reached Ceyhan on 28 May 2006.
Reconstruction of the shop No. 6 of the Aksu Ferroalloy Plant in partnership with Eurasian Resources Group
Reconstruction of the largest smelting division of the Aksu Ferroalloy Plant — shop No. 6 — is part of a large-scale modernization of the entire main production of the enterprise. The beginning of this work was laid in 2014 with the implementation of basic engineering by company "Tenova Pyromet". She also became the main supplier of equipment. The renovation project will cover three more furnaces and will be completed by 2024.
We are taking part in the construction of a ferroalloy gas utilization power plant at the Aktobe Ferroalloy Plant together with the Eurasian Group
The development of the technological part was carried out by a company that for a long period investigated the current work of production before offering a solution. We are talking about a complete reconstruction - we dismantle all outdated equipment and replace it with a completely new one. Now all electrofilters are being replaced with bag filters, which are much more efficient.
Fill out the application and we will contact you
Head Office UAE
AI SHMOOKH BUSINESS CENTER, ONE UAQ
INDIA OFFICE
OUTH-WING, YADAV NAGAR, CHANDIVALI, POWAI, MUMBAI, MAHARASHTRA, 400072
CHINA OFFICE
898 GUANGZHOU BLVD S, HAIZHU DISTRICT, GUANGZHOU, GUANGDONG PROVINCE, 510305